What this rate covers

  • Rooftop solar PV
  • Ground mount PV
  • Battery storage
  • Solar plus storage combined
  • Main panel upgrade filed with the array
  • Derate and line side tap
  • Reroof and reinstall

Not listed? Ask. Most permit work in Los Angeles County and surrounding cities lands in one of these tiers, and if yours does not we will tell you which one it is closest to before you commit.

What the department wants from you

Send what you have. Anything missing, we come back and ask once, before it goes in rather than after a correction.

  1. Signed contract or a scope you can stand behind

    System size in kW DC, module and inverter counts, and whether storage is on the same permit.

  2. Plan set

    Site plan, roof layout, single line diagram, attachment detail, and placards. If you do not have one, we can draw it.

  3. Equipment cut sheets

    Module, inverter, optimiser, and battery. The listing numbers on these are what SolarAPP+ checks against.

  4. Your licence and BTRC numbers

    The application goes in under your licence and you sign it. We prepare everything up to that line.

  5. Owner contact for the signature

    Some jurisdictions want an owner declaration alongside the contractor's.

Where this one gets filed

  • SolarAPP+
  • LADBS PermitLA
  • EPIC-LA
  • Symbium
A residential construction site in Los Angeles

Add-ons that apply here

Rush filing
Ask for a quote
Main panel upgrade added to a solar permit
Ask for a quote

Send the job and we will tell you what applies. Plan check comments come to us.

Questions we get on this one

Is SolarAPP+ priced differently from plan check?

They are two different jobs. A SolarAPP+ city runs an automated check and can issue immediately. A city still running solar through full plan check means a human reviewer and correction rounds. We quote each job on that path.

Do you handle the panel upgrade on the same permit?

Yes, when the jurisdiction allows it on one submittal. It is an add-on rather than a second full permit fee, because the application work overlaps.

What about interconnection and PTO?

That is a separate track with the utility and it is not part of the building permit. We file the permit. Tell us if the utility application is also stalled and we will say plainly whether we can help with it.

Got a permit sitting on your desk?

Send the address and scope. We will come back with a price and a realistic timeline.

Send us a job

Address and scope are enough to get a real number back. We will tell you what else the department needs.