What the department wants from you

Send what you have. Anything missing, we come back and ask once, before it goes in rather than after a correction.

  1. Dimensions and attachment

    Size, post spacing, and whether it attaches to the house or stands free. Attachment is what the reviewer looks at first.

  2. Where it sits on the lot

    Distance to each property line. Setbacks are the single most common reason a patio cover gets corrected.

  3. The manufacturer's engineering, if it is a kit

    Pre-engineered aluminium covers come with a stamped set. We mark the right details for your span and load rather than submitting the whole catalogue.

  4. A photo of the yard

    An owner-marked phone photo is genuinely enough for us to start a site plan.

  5. Your licence and BTRC numbers

    Filed under your licence, signed by you.

Where this one gets filed

  • LADBS PermitLA
  • EPIC-LA
  • City counters
Close detail of a construction plan sheet

Add-ons that apply here

Rush filing
Ask for a quote
Site plan drawn from scratch
Ask for a quote

Send the job and we will tell you what applies. Plan check comments come to us.

Questions we get on this one

Do I need engineering for a patio cover?

For anything but the smallest structures, yes, and most aluminium kits ship with a pre-engineered stamped set. The work is not finding engineering, it is marking the correct details for your span, load, and attachment so the reviewer is not left guessing.

Can you draw the site plan?

Yes. We work from parcel data and aerial imagery, and we include it in the quote when you need it. It is a permit exhibit, not a boundary survey, and we say so on the sheet.

What usually gets rejected?

Setbacks, lot coverage, and attachment detail, in that order. A cover drawn too close to the rear line is the classic one, and it is cheaper to catch before submittal than after.

Got a permit sitting on your desk?

Send the address and scope. We will come back with a price and a realistic timeline.

Send us a job

Address and scope are enough to get a real number back. We will tell you what else the department needs.

permitprola@gmail.com

Fields marked with an asterisk are required.

Plain language is fine. “Bathroom gut and remodel, moving the toilet” tells us what we need.